Shawn's parents had tickets to the college football game in town, so they spent the night at our place. Derald helped Shawn for a few hours and they worked on installing the ledger board that will eventually someday attach the deck to the house.
We followed a "best practice" approach to make sure we waterproofed the wall behind the ledger board as well as we could, to prevent moisture from infiltrating into our wood framing. So first, you have to locate where the ledger board will go and try to snap a level line. Then, you attach a layer of flashing onto the wall so that it will sit behind the ledger. We decided to use a waterproofing peel-n-stick material that is used on the roof to protect against ice dams and water damage. That's the black stuff you'll see in the picture.
After that, you install your ledger board. Shawn and Derald screwed it onto the wall for temporary support. The board gets bolted through the rim joist. After the ledger board was installed, Shawn and Derald tore down the scaffolding and moved it over to the other side.
Shawn decided not to work on the living room gable until a later time when he can get some help since he will be so high up in the air.
I was concerned about the number of bolts because we have a 1" of foam between the ledger board and the rim joist, and basically when you look at the mechanics and engineering of load distribution and such, that would not be enough. So we followed the bolting schedule recommended for our situation that I found online on some university engineering department website. When I asked for 30 bolts, the guy wondered if I plan to land a helicopter on that deck.
And yes, when you look at that ledger board, it definitely looks like overkill. So that ledger board isn't going anywhere.
Once the board was bolted, Shawn put a bead of caulking at the top between board and wall, then he installed what is called deck flashing. (That's the galvanized steel Z flashing that you see Shawn installing in this picture).
Once that was installed, another layer of the black waterproofing was installed over the of the deck flashing, and tucked under the Tyvek paper. So theoretically, any water that would happen to get behind the siding or the deck, will have nowhere to go but out.
Once Shawn was finished with that, he worked on finishing the siding under the ledger board, and did the trim around the door and window, then began siding the area above the ledger board.
They finished with the siding, except where a base for an outdoor light needs to be installed, and they didn't go all the way up. Then they started working on the soffits, and this is a picture of the progress so far.
Next is to finish the soffit, build that little end triangle, and install the fascia.
We have decided that before the ground freezes, we'd like to run the water line, septic line, and the electricity to the house, and do some rough/final grading around the house, and inside the garage. So we've been busy quoting rock and sand, and mini-excavators and skid loaders to use sometime in October. Right now we are hunting for an electrician to do the electrical, since the one we had talked to had a heart attack over this summer and is not working at this time.
So Shawn will continue on with the soffit, and once we have the electrician lined-up, we'll switch gears and stop the soffit work to do all that other stuff. We'll see what we're up to next week.
Until then.