Then my dear father-in-law, Derald, saved us again. He took vacation from work and came down on Thursday night to help us get that barn painted. So Friday, Shawn took some vacation from work and the two of them went at it. Shawn's brother, Brian, stopped by after work for a couple of hours. By evening they had all of the red paint done. Friday night my mother-in-law came down. We had a full house, since my parents are visiting. On Saturday, my parents babysat Evan, while we tackled cleaning the barn. My in-laws could not stand the mess so before they could help us finish the chicken house we were building in the barn, they happily suggested we do something about the clutter and mess in there. We've been wanting to do something about that mess, but we've been too busy or too tired, and with the extra help, it actually was not that bad. I think this is the first time since the haunted barn party that we've seen the concrete floor in there (and that was a few years ago).
Here's the beatiful barn, in all it's red glory.
We sent the pictures to the insurance company. We'll see what they say. They will probably ask that we fix the hole in the siding on the front, or some other obnoxious little minute detail to fix.
On the house construction, not much progress to report. Painting has taken up our time, and the weather is still not helping. We met with the electrician to discuss how to go forward now that the new law in Iowa prohibits us from doing our own work. Just thinking about it makes me shake with rage, but I'd have to start another blog to rant if I get started >:S
Anyway, we'll wait to see what the quote is for the electrician to do things that we are perfectly capable of doing. Alas, I will not go there.
Shawn did start sealing around the windows with low expansion foam, since we really haven't been able to work outside. It's been raining a lot, and it is supposed to rain some more the rest of this week, so chances are we will get nothing done outside yet again.
We need to dig the utilities and redo the grading before siding can go up, and we need the ground to be dry before we can dig anything. I think what we can do is seal up between the sill plate and the ICF foam on the exterior. I will not be pretty work, but it will be dry enought to do that.
At least the good news is that with all of the rain that we've had so far, out basement is still dry. So we must have done something right with the dampproofing on the basement.
So, hopefully we can finally get the siding started soon. Maybe we'll side the upstairs first since there is a trim board that goes around horizontally all around the house, and we can start from there. Then we can do the basement siding once it actually gets dry enough to get the utilities dug and the grading finalized.