The framers got started on Monday, Veteran’s day. They finished some of the framing that we didn't do in the beginning, like the corner tub, since we weren't sure what we were doing there. And of course, the good think about building for four years is that you have time to change your mind. The bad thing about having 4 years to build something is that you have time to change your mind. So I changed my mind on a couple of things and Shawn changed his mind of a couple of things. Add to that the things that needed fixing or changed because they didn't turn out quite like they should have the first place (like garage utility doors that didn't close! Or a door framed in the wrong spot!).
That day framing started was a holiday for us so we were here during the day. It felt really weird to have construction going on and we weren't doing any of it. The other part that felt weird was that we're not in charge, but if you know me, you probably can't believe that I will have my nose out of it. I still geek people out with my engineering technicalities. But hey, if I wasn't picky about measurements being to the inch, we would have found out too late that the fridge wouldn't fit in the space they framed last week. And I do probably find it hard to let the contractor do his job (he's probably tired of me already asking questions all the time) :)
But yay! Finally… all of the bidding, and pricing, and fretting, and chasing
of our tails… it finally all paid off and came to fruition! It's all in God's timing.
| Like an attic. |
| Wish there had been an easier way (besides burning!) to take care of this. |
You can see here how high it piled in front of our barn!
Being the super itchy stuff, this job called for tyvek suits and masks. Shawn
and I took turns climbing up the ladder to haul this up. Took us most of the
afternoon to do it, but we got it done. I think Shawn still hates me for
wanting to save it, but it will come in handy. (I’m sure.)
| Proper PPE |
The other thing we did to get ready was to move everything
out of the house that was not essential and moved all of our furniture to the
garage. We also packed everything away, moved both the kids and our beds into
one bedroom. All we have left is two mattresses, a folding table and green lazy
boy chair, a coffe table and the tv, some clothes and toiletries. 90% of the kitchen
got packed and we’ll make do with paper plates and cups. Funny how you can
actually live with just about nothing.
| Evan thought it was fun to suck all the dead flies! |
Now it was time for construction.
The framing crew tackled several
things on the to-do list of changes:
1.
Finish the framing in the master bath to frame
the tub and the walk-in shower
| The corner tub will go on the left, the walk-in shower is to the right |
2. Rearrange mudroom so we could open up the wall to the stairwell and have railing there
| The wall to the left used to go all the way to the end of the stairwell opening |
3. Open up the wall in the stairwell into the basement
| It definitely got cold in the basement with no insulation and open to the upstairs! We are notorious for building in winter (just check past posts in winter!) |
4. Add an arched art niche in the wall in the entrance foyer
5. Redo the main door to go from a standard door with a transom window on top to a tall 8 ft door.
| Opening up that wall now lets us see the door from the kitchen! Really helped to open it up a bit more. |
7. Add a closet in basement hobby room
(Mmmmh. I thought I had taken a picture, but looks like I didn't) Where the washer and dryer were in the basement, we decided to turn it into a proper closet, but left the W/D hook-ups. Eventually when kids do their own laundry, they won't have to haul it upstairs.
8.
Frame in the new fireplace upstairs
| That was supposed to be a corner fireplace, but it wouldn't fit! |
10. Moved the garage door over
| Door used to be to the left, and it was too close to the parked cars when it opened |
11. Add a landing inside the garage from the new door location to the house door and some steps.
12. And other miscellaneous things here in there, like bulkheads, access panels, and others. Everything turned out great, but one of the things that pleased us a lot was having the 3 doors in the garage re-hung. They now close right without catching!
I can already envision how things will look when finished. And thanks to Houzz I got tons of pictures for ideas.
So we're a couple of weeks into construction and we were already tired, but
not of construction! No… we’re tired of all the decisions. Eventually we will
have to pick out everything from light fixtures, to paint colors, to even the
color of the outlets! There seems to be a decision that needs to be made for
everything. But obviously that’s life under construction!
The other thing that became very obvious to us was that
there’s no way we can stay in the house while it is under construction. Initially
the work was supposed to go main floor first, we move up, then they finish the
basement. But as soon as we signed the contract things changed. Apparently
we're not saving much to do it this way, and it will mess up the
schedule trying to get subs to come back for the basement. So scratch that
plan. New plan is that both the main floor and basement will be worked on at
once!
We quickly had to find a place to live, and we’ll actually
be moving out this weekend. Not very many places rent by the month, so our
choices were very limited (like only 2 places!). And guess where we’re going?
Back to campus town!We’re moving to a basement apartment in an old house 3
blocks from campus. So here’s to hoping we don’t have neighbors that party more
than they study.
We’re hoping we will only have to be there December and
January and that we’ll be able to move back in February. We’ll see how things
go!
To save money, one of the duties we are responsible for is
cleaning. So we will be going back to the house a lot to sweep and clean. In
the basement, the carpet that we installed two years ago will be pulled up and
reused in a different room. So I bought some of this handy carpet cover
protector and covered the carpet to help keep it from getting too dirty while
under construction. Rich wants us to pull it up and roll it out, but our foam
pad underneath is glued to the concrete, and we think that carpet will protect
it better, so we’re leaving it for now.
Also, since the basement will get finished as well, we will
get ceiling drywall (finally) and texture. So this meant that we needed to take
off all of the cover plates in the basement outlets and switches. Another thing that needs to
go completely is our temporary kitchen! So now that we are moving out, we took that apart
and moved it out. The appliances we moved to the bedrooms so they have room to
work in the bar/lounge area.
Things are pretty chaotic, but progress is going along well!
Next month: Rough Ins will start!