There's really not much to narrate about what has happened in the last two weeks since my last post, since it has mostly been drywall work. The Drywaller's worked on and off during the weekend, and it took about four days total to get all of the drywall hung. One thing that you will notice is that we do not have a ceiling. And we chose to live with the industrial look of having the ceiling exposed. We debated long and hard about making this decision because there are several pros and cons about what we chose. You basically have a choice of either a drywall ceiling, which definitely looks nicer and is cheaper compared with a suspended grid of ceiling tiles. The disadvantage of a drywall ceiling is that it is more of a permanent thing. And with having the main floor unfinished, we know we need access to the joist bays for utilities. But the problem with a suspended ceiling is that you loose headroom, since it is a dropped ceiling (and we love out 9 ft tall rooms) so we were not willing to compromise on that. The other issue was cost: basically a suspended ceiling is more expensive than drywall, but not only that, the electrician told us that rough in for the upstairs would be much higher if we have a suspended ceiling since they have to work around it. So taking all of those things into consideration, and the fact that we simply didn't have the budget to do all of the upstairs utilities at this time, we decided to go with the very unusual way of going without any ceilings at all. And since we do want drywall ceilings eventually, that was something else that merited attention.
Basically the top 6 inches or so of our drywall walls will not have texture or paint, for the simple reason that when they do come back to put in a drywall ceiling, he needs the bare drywall so that the mud job looks nice and as if we started with a drywall ceiling right off the bat.
But I am on a quest for creative ways to disguise our open ceiling while we live here with a tiny almost non-exitent budget to accomplish that. (Free stuff is going to be the key here) So we'll see what I can come up with.
Here Evan is very excited about his bedroom actually getting some walls in. You can seen that it didn't take long for things to get very messy. But Evan loved playing in all of that white dust. His wooden train made many pitstops around the rooms.
Here's a view of my laundry closet in the Hobby/Guest Bedroom.
And here, they are working on the bedrooms. To me it seemed like a waste to put a 12' sheet of drywall up, only to cut out the window and throw away that piece. But as Jose explain it, most drywallers will use three pieces above and three pieces below. The problem is more joints that need to be finished, which would make the taping quote higher, and the other is that the joint at the window corner will crack. This way is better. You do end up wasting some drywall, but they were really good about re-using as many pieces as they could in other spots.
Here you can see the cubby by the fireplace without any sheetrock. Wait until I get a picture of the finished thing. Looks amazing.
This one shows the family room in progress. Coming along quite nicely.
A view down the hallway towards the Office, which will actually be Bianca's bedroom while we live down here.
The view of the drywall above the shower. The Bathroom and the Storm Shelter room were the only two rooms which will actually have a drywall ceiling. The reason is that both of these rooms needed insulation in the ceiling, and it needed to be contained. But you can get a glimpse of what the future holds for the rest of the basement. (If we can save up the money, I'm hoping that this will be in Phase III of our project).
Here's a view of the bathroom where the sink cabinets will be located. Because budget is really tight right now, we're looking for creative ways to save money where we can, and live with some things for a while until we can upgrade.
When my in-laws came to visit a week ago, we took a trip down to the Habitat for Humanity Re-Store in Des Moines. It's like the Goodwill of construction materials.
We did find a nice 8 ft oak double sink vanity for $250 (A brand new double sink vanity top alone starts at $750)
To say it was a bargain was an understatement. However, there was no way we could get an 8ft one piece monster to turn the corner down the hall. So we had to pass it up.
This next picture is a rough stage view of where the toilet will go. We did go to Lowe's and picked up a toilet this past weekend, so it's on the queue of things to install in the next couple of weeks. Very exciting indeed.
Here's a shot of the Shelter, or the Vault as the drywaller's call it. Wait till I get a chance to take some pictures of the finished thing. What a difference.
And here you can see Juan as he very carefully works around the trickiest wall. It was very important that they not hit any pipe or wire and you can see there was a lot of them in this one wall alone!
They finished hanging all of the drywall on a Friday, and Juan and Jose spent the rest of day laying paper down to cover all of the floors to keep the drywall mud from making an even bigger mess. Then the finishing crew came in on Saturday to place the first coat of mud and tape all of the seams. On Tuesday they came back to sand it all down and to put a second coat of mud. On Thursday they returned to sand it all smooth, then on Friday Jose came back to throw the texture on the walls.
We went with what they call Orange peel, which is supposed to be the texture of the outside of an orange. Very neat.
Jose still has to finish the mechanical room and the fireplace before he is done, but he will do those on days he doesn't have other jobs.
In the meantime, we have begun to prime the walls! We'll start off getting the safe room painted and dry so we can move some of the things that we need to store long term, like the window screens for upstairs and floor registers that we already have, and hings like paint, caulk, etc that can't be outside to freeze in the garage. So we went to Menards this past weekend to take advantage of a 25% off sale on light fixtures (talk about God's timing again) and bought 10 gallons of primer, and an exterior door that we will use to close off the basement at the base of the stairs.
So tonight Shawn began to frame the door because our radiant floor system is actually in operation and we need to keep the heat in. That's right! You're eyes are not deceiving you! WE HAVE HEAT! Praise goes to the Lord, for he has led us to this point! I couldn't be any happier about how the whole thing turned out.
It felt weird not having anything to do while the drywaller's were at work (ok, we had plenty that we could have been doing, but we took a break). Eventually we couldn't stand it any longer, specially when the temps dipped into the low 30's at night. With a slab full of pipes full of water, that's a scary thought, not to mention that our pluming is operational and the pipes are full of water as well. So we made the low voltage electrical connections for the the pump, the system relay controller, all of the zone valves, and wired the thermostats. We set the thermostats and went to bed. The next morning we went to check, the outside temperature was 45ºF, and our basement was nice and toasty at 60º. I can definitely now believe why they claim that radiant heat is a much more "comfortable" heat in which you can have a lower temp. set on the thermostat and still feel cozy. Our floors got up to 70ºF. and it was like walking on a nice heated pad. Nice! I'm so going to be spoiled by this.
The other thing that Shawn has done since the last post, is that he once again rolled out the insulation on the main floor so we can keep our heat in the basement. I'll need to take some pictures again. In the walkway we didn't want to leave it just the subfloor since it will let heat out, so we settled with recycling a pile of scraps of blue foam that we had leftover from two years ago when the slab was poured. Talk about being green!
As soon as we're done painting the storm shelter, we'll move onto the bathroom so that Shawn can get the toilet in, and do something about a sink. But basically as soon as we're done painting, the electrician can come back and do the trim out to install all of the switches, outlets, and light fixtures. It's getting to be an exciting time!
It always seems like every year we're in some sort of crunch to beat the snow. This year, we're on the clock to beat the weather from freezing that garden hose that is supplying water to the old house from the new house!
I so hope we can be moved in before that happens! Even if it means the basement won't be as finished as we'd like.
But who cares! We have heat! I can't wait to say bye-bye to our whole house space heater and move into the luxury of radiant heat!
Until next time.